# BFI Waste Services LlC
> **Administrative - Formal** · FY2004 · — · Final Order With Penalty
## Case
- **Activity ID:** `110214`
- **Case Number:** 06-2004-4317
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- BFI Waste Services LLC (complaint) (settlement)
## Summary

Summary of Findings:

* No management approval of plan.

* No plan amendment(s) if the facility has ahd a change in: design, construction, operation, or maintenance which affects the facility's discharge potential.

* Inadequate or no prediction of equipment failure which could result in discharges.

* No training on the operation and maintenance of equipment to prevent discharges.

* Materials of ocnstruction are not sufficiently impervious.

* Adequatae reacords of drainage events are not maintained.

* Records of inspections of aboveground tanks are not maintained.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*