# RUSSELL OIL COMPANY
> **Judicial** · FY2003 · — · Final Order With Penalty
## Case
- **Activity ID:** `110296`
- **Case Number:** 06-2003-5317
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** $5K
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- RUSSELL OIL COMPANY (complaint) (settlement)
## Summary

1. SECTION 9006 OF THE SOLID WASTE DISPOSAL ACT ( SDWA ), 42    U.S.C. SECTION 6991E.                                     2. RUSSELL OIL COMPANY                                          215 EAST 9TH STREET                                          RECTOR, CLAY COUNTY, ARKANSAS 72461                          FACILITIES: 1) T & P - MARMADUKE, ARKANSAS                               2) BOBBY'S PB/BULK PLANT - RECTOR, ARKANSAS                  3) HOLLEY ISLAND STATION - RECTOR, ARKANSAS                  4) GOODMAN'S GROCERY - PARAGOULD, ARKANSAS                   5) T & P EXPRESS (TOPPERS) - GROVE, ARKANSAS                 6) T & P EXPRESS - MONETTE, ARKANSAS          3. RESPONDENT WAS IN VIOLATION OF SECTION 9003 OF RCRA BY:      1A AND 1B) FAILURE TO MAINTAIN THE CORROSION PROTECTION      SYSTEMS FOR THE USTS AT FACILITIES #1 AND #3 WHILE THE       UST SYSTEMS WERE IN TEMPORARY CLOSURE; 2) FAILURE TO EN-     SURE THAT THE IMPRESSED CURRENT CATHODIC PROTECTION SYS-     TEM WAS RUNNING PROPERLY EVERY 60 DAYS FOR 11 UST SYS-       TEMS; 3) FAILURE TO HAVE THE CATHODIC PROTECTION SYSTEMS     TESTED BY A QUALIFIED CATHODIC PROTECTION TESTER WITHIN      6 MONTHS, THEN EVERY 3 YEARS; 4) FAILURE TO COMPLY WITH      THE RELEASE DETECTION FOR TANKS AND PIPING REQUIREMENTS      TO ASSURE AN ACCEPTABLE MONTHLY RELEASE DETECTION SYSTEM;    5) FAILURE TO CONDUCT AN ANNUAL LINE TIGHTNESS TEST OR       COMPLY WITH THE MONTHLY MONITORING REQUIREMENTS FOR PRES-    SURIZE LINES; 6) FAILURE TO CONDU

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*