← EPA enforcement cases

Porter Construction (TXU010382)

Administrative - Formal · FY2004 · — · Final Order With Penalty · 111975

Penalty
Cost recovery
Compliance action

Case

Case Number
06-2004-1981
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

Porter Construction, Amarillo, TX (TXU010382): A storm water compliance inspection was conducted by EPA at the site of the Pak A Sak in Amarillo, TX, on February 5, 2004. Porter Construction was the general contractor for the project and met the definition of �operator� as defined by the Texas Storm Water General Construction Permit. Violations cited were failure to develop and implement a Storm Water Pollution Prevention Plan (SWPPP). Because the Texas Storm Water General Construction Permit specifically states an operator is automatically covered under the permit if a SWPPP is developed, Porter Construction was also cited for not having permit coverage because there was no SWPPP. The site met the criteria for the Expedited Settlement Offer, which has been drafted. Contact: Diana McDonald (6EN-WC), 214-665-7495

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown