1/15/04 - CAFO ISSUED, ASSESSING A ZERO PENALTY. VIOLATION 1: RESPONDENT IS IN VIOLATION OF THE SDWA AND 40 CFR 144.28(c)(2)(iv) FOR FAILURE TO DEMONSTRATE THE MECHANICAL INTEGRITY OF, OR TO PLUG AND ABANDON THE E.B. ONAN #4W, THE C.T. NEWMAN #5 AND THE C.T. NEWMAN #6 INJECTION WELLS. VIOLATION 2: RESPONDENT IS IN VIOLATION OF THE SDWA AND 40 CFR 144.28(h)(2)(i) FOR FAILURE TO SUBMIT ANNUAL MONITORING REPORTS FOR THE E.B. ONAN #4W, AND THE C.T. NEWMAN #5 AND #6 WELLS. VIOLATION 3: RESPONDENT IS IN VIOLATION OF THE SDWA AND 40 CFR 144.28(h)(2)(i) FOR FAILURE TO SUBMIT INJECTION FLUID ANALYSIS DATA FOR THE E.B. ONAN #4W, AND THE C.T. NEWMAN #5 AND #6 INJECTION WELLS