# Libcon, Inc. (TXU010450)
> **Administrative - Formal** · FY2004 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `118062`
- **Case Number:** 06-2004-2140
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Libcon, Inc. (TXU010450) (SB) (complaint) (settlement)
## Summary

LIBCON, INC (TXU010450):  A storm water compliance inspection was conducted on 
March 16, 2004, at the construction site of the Pita Mangana Elementary School in Laredo, TX.  Libcon, Inc., was the permitted contractor for the project.  Libcon, Inc., had applied for permit coverage under the Texas Construction General Permit (TCGP); however, there were several permit violations noted.  Included in the violations were no general location map not included as part of the Storm Water Pollution Prevention Plan (SWPPP); SWPPP had not been updated as required; there was no copy of the permit language included in the SWPPP; the SWPPP had not been signed and certified; site inspections were not properly documented, signed and certified; selected controls were not properly maintained as required by the SWPPP.  Because the Respondent met the criteria for the Expedited Settlement Offer, one was drafted and routed for signature.  Contact:  Diana McDonald (6EN-WC), 214-665-7495

---