PE&H INVESTMENTS (TXU010444): A storm water compliance inspection was conducted by EPA on March 16, 2004, at the construction site of Mazda of Midland. PE&H Investments is both the owner and the developer. In accordance with the Texas Construction General Permit, under most circumstances, construction sites of greater than one (1) acre, but less than five (5), are automatically granted permit coverage if the operator develops a Storm Water Pollution Prevention Plan (SWPPP) and posts a construction site notice. However, PE&H Investments failed to do either and was without permit coverage on the date of the inspection and had been since construction began. Because PE&H Investments met the criteria for the Expedited Settlement Offer, one was drafted and routed for signature. Contact: Diana McDonald (6EN-WC), (214-665-7495

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown