4/1/04 - ADMINISTRATIVE ORDER ISSUED. VIOLATIONS: NEITHER EPA NOR FDEP HAVE A RECORD OF RECEIPT OF A NOTICE OF INTENT IN THEIR RESPECTIVE DATABASES USED TO TRACK NOI SUBMISSIONS. A NOI IS REQUIRED BY PART III.A.1 OF THE PERMIT AND MUST BE SUBMITTED AT LEAST TWO DAYS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO POSTING OF THE NOI OR A COPY OF THE PERMIT COVERAGE NOTICE WAS FOUND AT THE SITE AS REQUIRED BY PART III.A.4 OF THE PERMIT. ORDER REQUIRES: A. WITHIN 7 CALENDAR DAYS, BEAZER HOMES SHALL SUBMIT AN INDIVIDUAL PERMIT APPLICATION OR A NOI FOR COVERAGE OF THE FACILITY UNDER THE FDEP PERMIT. A COPY OF THE PERMIT APPLICATION OR NOI SHALL BE PROVIDED TO EPA AND FDEP. IF BEAZER HOMES MAINTAINS A COPY OF A PERMIT COVERAGE NOTICE, THEN BEAZER HOMES SHALL SUBMIT A COPY OF SUCH NOTICE TO BOTH EPA AND FDEP. SHOULD CONSTRUCTION AT THE WINDSOR LANDING SITE BE COMPLETE, THEN BEAZER HOMES SHALL COMPLETE A NOT AND PROVIDE A COPY TO BOTH EPA AND FDEP. B. WITHIN 30 DAYS, BEAZER HOMES SHALL DEVELOP AND IMPLEMENT A SWPP. WITHIN 40 DAYS, BEAZER HOMES SHALL PROVIDE WRITTEN CERTIFICATION THAT IT HAS DEVELOPED AND IMPLEMENTED ITS SWPPP, AND IT KEEPS A COPY OF THE SWPPP ON SITE OR AN ACCESSIBLE LOCATION, AND THAT ITS BMP PLAN COMPLIES WITH PART V OF THE PERMIT. C. WITHIN 7 CALENDAR DAYS, BEAZER SHALL IMPLEMENT MAINTENANCE PROVISIONS AT ITS FACILITY TO ENSURE THAT TIMELY MAINTENANCE OF VEGETATION, EROSION AND SEDIMENT CONTROLS, STORMWATER MANAGEMENT PRACTICES, AND OTHER PROTECT

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown