6/14/04 - COMPLIANCE ORDER ISSUED. RESPONDENT FAILED TO COMPLY WITH THE PERMIT AT THE FACILITY AS FOLLOWS:
FAILING TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS.
FAILING TO ADEQUATELY INSTALL AND/OR MAINTAIN TEMPORARY OR PERMANENT MEASURES TO CONTROL AND RETAIN SEDIMENT, INCLUDING INSTALLATION AND MAINTENANCE OF SILT FENCING; FAILING TO INSTALL AND/OR MAINTAIN INLET PROTECTION; FAILING TO ADEQUATELY INSTALL OR MAINTAIN SEDIMENTATION BASINS AND SEDIMENT TRAPS; FAILING TO INSTALL DIVERSION DITCHES; LACK OF ADEQUATE GROUNDCOVER ON THE SLOPES OF SEDIMENTATION BASINS AND TRAPS; LACK OF GRAVEL ON ENTRANCES/EXITS; AND LACK OF GROUNDCOVER ON LOTS AND BASINS THROUGHOUT SITE WHERE CONSTRUCTION HAS BEASED FOR MORE THAN 15 DAYS.
ORDER REQUIRES:
WITHIN 7 CALENDAR DAYS, OVERCASH SHALL TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF SEDIMENTS FROM THE FACILTY, INCLUDING THE INSTALLATION AND MAINTENANCE OF SILT FENCES; INSTALLATION AND/OR MAINTENANCE OF INLET PROTECTION; ADEQUATE GROUNDCOVER ON THE SLOPES OF SEDIMENTATION BASINS AND TRAPS; GRAVEL ON ENTRANCES/EXITS; AND GROUNDCOVER ON LOTS AND BASINS THROUGHOUT SITE WHERE CONSTRUCTION HAS CEASED FOR MORE THAN 15 DAYS.
WITHIN 7 CALENDAR DAYS, OVERCASH SHALL INSTALL AND MAINTAIN SEDIMENTATION BASINS, SEDIMENT TRAPS, AND DIVERSION DITCHES AS SHOW ON THE PLAN AT THE FACILITY.
WITHIN 7 CALENDAR DAYS, OVERCASH SHALL PROVIDE OPERATION AND MAINTENANCE BY INSTALLING, REPAIRING, AND MAINTAINING SILT