← EPA enforcement cases

OVERCASH GRAVEL AND GRADING CO., INC. (HEARTLAND PLACE SUBDIVISION)

Administrative - Formal · FY2004 · — · Unilateral Administrative Order Without Adjudication · 121983

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2004-4796
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
Self-disclosure
N

Defendants (1)

Summary

6/14/04 - COMPLIANCE ORDER ISSUED. RESPONDENT FAILED TO COMPLY WITH THE PERMIT AT THE FACILITY AS FOLLOWS: FAILING TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS. FAILING TO ADEQUATELY INSTALL AND/OR MAINTAIN TEMPORARY OR PERMANENT MEASURES TO CONTROL AND RETAIN SEDIMENT, INCLUDING INSTALLATION AND MAINTENANCE OF SILT FENCING; FAILING TO INSTALL AND/OR MAINTAIN OUTLET PROTECTION; FAILING TO ADEQUATELY MAINTAIN SEDIMENTATION BASINS; FAILING TO INSTALL DIVERSION DITCHES; LACK OF GRAVEL ON ENTRANCES/EXITS; AND LACK OF GROUNDCOVER ON GRADED AREAS THROUGHOUT THE SITE WHERE CONSTRUCTION HAS CEASED FOR MORE THAN 15 DAYS. ORDER REQUIRES: WITHIN 7 CALENDAR DAYS, OVERCASH SHALL TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF SEDIMENTS FROM THE FACILTY, INCLUDING THE INSTALLATION AND MAINTENANCE OF SILT FENCES; INSTALLATION AND/OR MAINTENANCE OF OUTLET PROTECTION; GRAVEL ON ENTRANCES/EXITS; AND GROUNDCOVER ON GRADED AREAS THROUGHOUT SITE WHERE CONSTRUCTION HAS CEASED FOR MORE THAN 15 DAYS. WITHIN 7 CALENDAR DAYS, OVERCASH SHALL INSTALL AND MAINTAIN SEDIMENTATION BASINS, SEDIMENT TRAPS, AND DIVERSION DITCHES AS SHOW ON THE PLAN FOR THE FACILITY. WITHIN 7 CALENDAR DAYS, OVERCASH SHALL PROVIDE OPERATION AND MAINTENANCE BY INSTALLING, REPAIRING, AND MAINTAINING SILT FENCES; INSTALLING AND/OR MAINTAINING OUTLET PROTECTION; INSTALLING AND MAINTAINING SEDIMENTATION BASINS AND DIVERSION DITCHES; PROVIDING GRAVEL ON ENTRANCES/EXITS; AND PROVIDIN

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown