← EPA enforcement cases

JOHN WIELAND HOMES, INC. (BROOKHAVEN SUBDIVISION PHASE 1)

Administrative - Formal · FY2004 · — · Unilateral Administrative Order Without Adjudication · 122086

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2004-4771
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
Self-disclosure
N

Defendants (1)

Summary

4/20/04 - COMPLIANCE ORDER ISSUED. VIOLATIONS: FAILURE TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS; FAILURE TO MAINTAIN A RECORD OF THE EROSION AND SEDIMENT CONTROL FACILITY INSPECTIONS; FAILURE TO ADEQUATELY INSTALL AND/OR MAINTAIN TEMPORARY OR PERMANENT MEASURES THROUGHOUT THE SITE TO CONTROL AND RETAIN SEDIMENT, INCLUDING SILT FENCING; STORM INLET PROTECTION; OUTFALL PROTECTION; LAKE OF ADEQUATE GROUNDCOVER AROUND THE SLOPES AND SEDIMENTATION BASINS; LACK OF DIVERSION DITCHES AND CHECK DAMS; LACK OF STREAM CROSSING MEASURES; AND INADQUATE SLOPE GRADES, CONSTRUCTION, AND MAINTENANCE ON SEDIMENTATION BASINS AND SILT TRAPS. ORDER REQUIRES: WITHIN 7 CALENDAR DAYS, WIELAND SHALL TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF SEDIMENTS FROM THE FACILITY, INCLUDING SILT FENCING INSTALLATION AND MAINTENANCE NEAR THE CREEK, INSTALLATION OF EROSION CONTROLS AT ALL STREAM CROSSING AND BRIDGE CONSTRUCTION. WITHIN 7 CALENDAR DAYS, WIELAND SHALL INSTALL CHECK DAMS AND DIVERSION DITCHES AS SHOWN ON THE PALN AT THE FACILITY, TO DIRECT THE FLOW OF WATER AND SEDIMENT INTO SILT TRAPS AND SEDIMENTATION BASINS. WITHIN 7 CALENDAR DAYS, WIELAND SHALL PROVIDE OPERATION AND MAINTENANCE BY REPAIRING THE SILT FENCE IN NEED OF MAINTENANCE THROUGHOUT THE SITE; PROVIDING OUTLET PROTECTION, WEIR MAINTENANCE, STABILIZATION, AND ADEQUATE SLOPES AT THE SEDIMENTATION BASINS; PROVIDING STORM INLET PROTECTION; MAINTAINING SILT TRAPS AND SEDIMENTA

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown