4/1/04 - COMPLIANCE ORDER ISSUED.
VIOLATIONS:
NEITHER EPA NOR THE FDEP HAVE A RECORD OF RECEIPT OF A NOTICE OF INTENT (NOI) IN THEIR RESPECTIVE DATABASES USED TO TRACK NOI SUBMISSIONS. A NOI IS REQURED BY PART III.A.1 OF THE PERMIT AND MUST BE SUBMITTED AT LEAST TWO DAYS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO POSTING OF THE NOI OR THE FDEP COVERAGE NOTICE WAS FOUND AT THE SITE AS REQUIRED BY PART III.A.4 OF THE PERMIT. THE FDEP LOCATED NPDES PERMIT NO. FLR10G433 ISSUED TO BRIAR CORPORATION FOR CUMBRIAN LAKES. PLEASE PROVIDE INFORMATION REGARDING THE RELATIONSHIP OF BRIAR CORPORATION AND BEAZER HOMES.
ORDER REQUIRES:
WITHIN 7 CALENDAR DAYS, BEAZER HOMES SHALL SUBMIT AN INDIVIDUAL PERMIT APPLICATION OR A NOI FOR COVERAGE OF THE FACILITY UNDER THE PERMIT. A COPY OF THE PERMIT APPLICATION OR NOI SHALL BE PROVIDED TO EPA AND FDEP. IF BEAZER HOMES MAINTAINS A COPY OF A PERMIT COVERAGE NOTICE, THEN BEAZER HOMES SHALL SUBMIT A COPY OF SUCH NOTICE TO BOTH EPA AND FDEP. SHOULD CONSTRUCTION AT THE CUMBRIAN LAKES SITE TO BE COMPLETE, THEN BEAZER HOMES SHALL COMPLETE A NOT AND PROVIDE A COPY TO BOTH EPA AND FDEP.
WITHIN 30 DAYS, BEAZER HOMES SHALL DEVELOP AND IMPLEMENT A SWPPP. WITHIN 40 CALENDAR DAYS, BEAZER HOMES SHALL PROVIDE WRITTEN CERTIFICATION THAT IT HAS DEVELOPED AND IMPLEMENTED ITS SWPPP, THAT IT KEEPS A COPY OF THE SWPPP ON SITE OR AN ACCESSIBLE LOCATION, AND THAT ITS BMP PLAN COMPLIES WITH PART V OF THE PERMIT.
WITHIN 7 CALENDAR DAYS, BEAZER HOME