4/1/04 - COMPLIANCE ORDER ISSUED.
VIOLATIONS:
NEITHER EPA NOR THE FLORIDA DEPT OF ENVIRONMENTAL PROTECTION (FDEP) HAVE A RECORD OF RECEIPT OF A NOTICE OF INTENT (NOI) IN THEIR RESPECTIVE DATABASES USED TO TRACK NOI SUBMISSION. A NOI IS REQUIRED BY PART II.A.2 OF THE NPDES PERMIT AND MUST BE SUBMITTED AT LEAST TWO DAYS PRIOR TO COMMENCEMENT OF CONSTRUCTION. NO POSTING OF THE NOI OR A DESCRIPTION OF THE WORK TO BE COMPLETED WAS FOUND AT THE SITE AS REQUIRED BY PART II.C.2 OF THE NPDES PERMIT. THE FDEP LOCATED NPDES PERMIT NO. FLR10H940 ISSUED TO LA VINA TRUST TO CFG. PLEASE PROVIDE INFORMATION REGARDING THE RELATIONSHIP OF LA VINA TRUST TO CFG AND BEAZER HOMES.
ORDER REQUIRES:
WITHIN 7 CALENDAR DAYS, BEAZER HOMES SHALL SUBMIT AN INDIVIDUAL PERMIT APPLICATION OR NOI FOR COVERAGE OF THE FACILITY UNDER THE PERMIT. A COPY OF THE PERMIT APPLICATION OR NOI SHALL BE PROVIDED TO EPA AND FDEP. IF BEAZER HOME MAINTAINS A COPY OF A PERMIT COVERAGE NOTICE, THEN BEAZER HOMES SHALL SUBMIT A COPY OF SUCH NOTICE TO BOTH EPA AND FDEP. SHOULD CONSTRUCTION AT THE NONA CREST SITE BE COMPLETE, THEN BEAZER HOMES SHALL SUBMIT A NOT TO BOTH EPA AND FDEP.
WITHIN 30 DAYS, BEAZER HOMES SHALL DEVELOP AND IMPLEMENT A SWPPP. WITHIN 40 CALENDAR DAYS, BEAZER HOMES SHALL PROVIDE WRITTEN CERTIFICATION THAT IT HAS DEVELOPED AND IMPLEMENTED ITS SWPPP, THAT IT KEEPS A COPY OF THE SWPPP ON SITE OR AN ACCESSIBLE LOCATION, AND THAT ITS BMP PLAN COMPLIES WITH PART V OF THE PERMIT.
WITHIN 7 CA