# RYLAND HOMES (WESTCHESTER)
> **Administrative - Formal** · FY2004 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `122178`
- **Case Number:** 04-2004-4765
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- RYLAND HOMES (settlement)
## Summary

4/7/04 - COMPLIANCE ORDER ISSUED.  

VIOLATION:  RYLAND HOMES STATED IN A FACSIMILE ON AUGUST 12, 2003 TO SAIC THAT A NOTICE OF INTENT (NOI) FOR THE FACILITY WAS SUBMITTED ON AUGUST 24, 2001.  NEITHER EPA NOR FDEP HAVE A RECORD OF RECEIPT OF THE NOI IN THEIR RESPECTIVE DATABASES.  A NOI IS REQUIRED BY PART II.A.2 OF THE NPDES PERMIT AND MUST BE SUBMITTED AT LEAST TWO DAYS PRIOR TO COMMENCEMENT OF CONSTRUCTION.  NO POSTING OF THE NOI OR A DESCRIPTION OF THE WORK TO BE COMPLETED WAS FOUND AT THE SITE AS REQUIRED BY PART II.C.2 OF THE NPDES PERMIT.

ORDER REQUIRES:

WITHIN 7 CALENDAR DAY, RYLAND HOMES SHALL SUBMIT AN INDIVIDUAL PERMIT APPLICATION OR A NOI FOR COVERAGE OF THE FACILITY UNDER THE FDEP PERMIT.  A COPY OF THE PERMIT APPLICATION OR NOI SHALL BE PROVIDED TO EPA AND FDEP.  IF RYLAND HOMES MAINTAINS A COPY OF A PERMIT COVERAGE NOTICE ISSUED BY EPA FOR WESTCHESTER, THEN RYLAND HOMES SHALL SUBMIT A COPY OF SUCH NOTICE TO BOTH EPA AND FDEP.  SHOULD CONSTRUCTION AT THE WESTCHESTER SITE BE COMPLETE, THEN RYLAND HOMES SHALL COMPLETE A NOT AND PROVIDE A COPY TO BOTH EPA AND FDEP.

WITHIN 30 DAYS, RYLAND HOMES SHALL DEVELOP AND IMPLEMENT A SWPPP.  WITHIN 40 CALENDAR DAY, RYLAND HOMES SHALL PROVIDE WRITTEN CERTIFICATION THAT IT HAS DEVELOPED AND IMPLEMENTED ITS SWPPP, THAT IT KEEPS A COPY OF THE SWPPP ON SITE OR AN ACCESSIBLE LOCATION, AND THAT ITS BMP PLAN COMPLIES WITH PART V OF THE FDEP PERMIT.

WITHIN 7 CLENDAR DAYS, RYLAND HOMES SHALL IMPLEMENT MAINTENANCE PROVISIO

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*