← EPA enforcement cases

BEAZER HOMES (GREEN CROFT SUBDIVISION)

Administrative - Formal · FY2004 · — · Unilateral Administrative Order Without Adjudication · 122242

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2004-4778
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
Self-disclosure
N

Defendants (1)

Summary

4/20/04 - COMPLIANCE ACTION ISSUED. ORDER REQUIRES: BEAZER HOMES MUCH IMMEDIATELY INSTITUTE AN INSPECTION PROGRAM, IF ONE DOES NOT EXIST, WHICH COMPLIES WITH PART I.B.1, I.B.2, AND I.B.3 OF THE PERMIT FOR ALL EROSION AND SOIL CONTROL MEASURES IDENTIFIED IN THE PLAN, ALL DISCHARGE LOCATIONS AT LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 INCHES OR GREATER. WITHIN 7 CALENDAR DAYS, BEAZER HOMES SHALL PROVIDE MAINTENANCE OF SILT FENCING AT BASIN 13, BASIN 11, AROUND BASIN 16, AT THE BOTTOM OF THE SLOPE OF THE OUTER PERIMETER OF BASIN 17, AND ON THORSEN DRIVE LEFT OF PRATT DRIVE AS INDICATED ON PLAN, AND MAINTAIN SILT BUILD-UP WITHIN SEDIMENTATION BASINS (BASIN 11, 13, 16, 17 AND X). WITHIN 7 CALENDAR DAYS , BEAZER HOMES SHALL TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF SEDIMENTS FROM THE FACILITY, INCLUDING INSTALLATION OF PROTECTION FOR CURB INLETS AND STABILIZATION ABOVE PIPE AT THE STREAM CROSSING NEAR PRATT DRIVE AND DARLING COURT. WITHIN 7 CALENDAR DAYS, BEAZER HOMES SHALL INSTALL/MAINTAIN EROSION CONTROLS AT SEDIMENTATION BASINS (BASIN 11, 13, 16, 17 AND X), SUCH AS STABILIZE SLOPES, MAINTAIN WEIRS, AND INSTALL DIVERSION DITCHES AS REQUIRED BY THE PLAN, AND STABILIZATION OF THE ENTIRE BACK PORTION OF THE SITE. WITHIN 7 CALENDAR DAYS, BEAZER HOMES SHALL PROVIDE PROTECTION, ADJACENT TO BASIN 11, OF A FOOT STREAM BUFFER AS SHOWN ON THE PLAN, AND AT WETLANDS ADJACENT TO BASIN 17. WITHIN 14 CALENDAR DAYS,

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown