# AVERY DENNISON FASSON DIVISION OIL SPILL
> **Administrative - Formal** · FY2004 · — · Final Order With Penalty
## Case
- **Activity ID:** `122292`
- **Case Number:** 04-2004-5038
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- AVERY DENNISON (complaint) (settlement)
## Summary

6/16/04 - EXPEDITED SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY $3,750.  

VIOLATIONS:

FAILURE TO COMPLY WITH RECOGNIZED AND GENERALLY ACCEPTED GOOD ENGINEERING PRACTICE.  ELECTRICAL BOXES WERE UNCOVERED.

FAILURE TO COMPLETE THE PROCESS HAZARD ANALYSIS.  THE PROCESS HAZARD ANALYSIS DID NOT ADDRESS THE FOLLOWING REQUIREMENTS OF THE 40 CFR 68.67(c):

     A.  CONSEQUENCES OF FAILURE OF ENGINEERING AND ADMINISTRATIVE CONTROLS;

     B.  STATIONARY SOURCE SITING;

     C.  HUMAN FACTORS; AND

     D.  AN EVALUATION OF A RANGE OF THE POSSIBLE SAFETY AND HEALTH EFFECTS OF FAILURE OF CONTROLS.

FAILURE TO DOCUMENT WRITTEN PROCEDURES WHICH ADDRESS THE FOLLOWING:

     A.  SAFETY AND HEALTH CONSIDERATION - PROPERTIES OF, AND HAZARDS PRESENTED BY, THE CHEMICALS USED IN THE PROCESS; AND

     B.  PRECAUTIONS NECESSARY TO PREVENT EXPOSURE, INCLUDING ENGINEERING CONTROLS, ADMINISTRATIVE CONTROLS, AND PERSONAL PROTECTIVE EQUIPMENT

FAILURE TO ANNUALLY CERTIFY THAT THE OPERATING PROCEDURES ARE CURRENT AND ACCURATE, AND THE PROCEDURES HAVE BEEN REVIEWED AS OFTEN AS NECESSARY

---