Reece Albert, Inc.

Administrative - Formal · FY2004 · — · Final Order With Penalty · 122329

Penalty
Cost recovery
Compliance action

Case

Case Number
06-2004-2151
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

REECE ALBERT, INC. (TXU010445): An inspection was conducted by EPA on March 18, 2004, to evaluate Reece Albert, Inc.ýs compliance with the Texas Construction General Permit. While the Respondent had developed a Storm Water Pollution Prevention Plan (SWPPP), they had not applied for permit coverage as required. There was also no required signs posted to indicate the location of the SWPPP or contact person. Because Reece Albert, Inc., met the criteria, an Expedited Settlement Offer was issued and accepted.