# DINGWELL, RICHARD
> **Judicial** · FY1987 · — · Final Order With Specified Cost Recovery
## Case
- **Activity ID:** `127`
- **Case Number:** 01-1987-0008
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Specified Cost Recovery
- **Penalty assessed:** $0
- **Cost recovery:** $1.85M
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- FAIRCHILD CAMERA & INSTRUMENT CO. (complaint) (settlement)
## Summary

THE MCKIN SITE LIES IN GRAY, MAINE, APPROXIMATELY FIFTEEN MILES NORTH OF PORTLAND, MAINE AND THE ATLANTIC OCEAN.  THE  SITE IS APPROXIMATELY 7 ACRES IN SIZE, WITH APPROXIMATELY    4.5 ACRES OF CLEARED AND PARTIALLY EXCAVATED LAND AT THE     TIME OF THE RECORD OF DECISION.  THE MCKIN FACILITY IS LO-   CATED IN AN AREA OF ABANDONED SAND AND GRAVEL EXCAVATION.       THE MCKIN COMPANY OPERATED A TANK CLEANING AND WASTE      REMOVAL BUSINESS USING THE SITE FOR COLLECTION, STORAGE,     DISPOSAL, AND TRANSFER OF PETROLEUM WASTES AND INDUSTRIAL    CHEMICAL WASTES.  WASTE HANDLING FACILITIES AT THE SITE USED DURING MCKIN COMPANY OPERATIONS INCLUDED 22 ABOVE-GROUND     STORAGE TANKS, AN ASPHALT-LINED LAGOON, AND AN INCINERATOR.     THE MCKIN COMPANY AND OTHER TRUCKED LIQUID WASTES TO THE  SITE.  THE WASTE HANDLING PROCEDURES AT THE SITE INCLUDED    DISCHARGE TO THE GROUND, STORAGE IN TANKS OR THE LAGOON,     TRANSPORT OFF-SITE BY TRUCK, INCINERATION, AND ON-SITE       BURIAL.  THE MCKIN FACILITY RECEIVED APPROXIMATELY 100,000   TO 200,000 GALLONS OF WASTE ANNUALLY BETWEEN 1972 AND 1977.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*