7/30/04 - COMPLIANCE ORDER ISSUED.
VIOLATIONS:
FAILURE TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS;
FAILURE TO ADEQUATELY INSPECT EROSION AND SEDIMENT CONTROL MEASURES AND MAINTAIN A RECORD OF THE EROSION AND SEDIMENT CONTROL FACILITY INSPECTIONS;
FAILURE TO ADEQUATELY INSTALL AND/OR MAINTAIN TEMPORARY OR PERMANENT MEASURES THROUGHOUT THE SITE TO CONTROL AND RETAIN SEDIMENT, INCLUDING CONSTRUCTION ENTRANCES AND EXITS; STORM INLET PROTECTION; OUTLET AND OUTFALL PROTECTION (RING FILTER); LACK OF ADEQUATE GROUNDCOVER AROUND THE SLOPE GRADES, CONSTRUCTION, AND MAINTENANCE ON SEDIMENTATION BASINS AND SILT TRAPS.
ORDER REQUIRES:
A. WITHIN 7 CALENDAR DAYS, WIELAND SHALL TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF SEDIMENTS FROM THE FACILITY, INCLUDING INSTALLATION AND MAINTENANCE OF STORM INLET PROTECTION; OUTLET AND OUTFALL PROTECTION; RING FILTER AT DRY DETENTION BASIN; AND STABLIZATION PRACTICES ON UNCOVERED AREAS, I.E., SLOPES THROUGHOUT SITE, PLUNGE POOL AREA AT FES #5, SEDIMENT OFF-SITE AT FES #5.
B. WITHIN 7 CALENDAR DAYS, WIELAND SHALL PROVIDE OPERATION AND MAINTENANCE BY INSTALLING AND MAINTAINING CONSTRUCTION ENTRANCES/EXITS; PROVIDING OUTLET PROTECTION, WEIR MAINTENANCE, STABILIZATION, AND ADEQUATE SLOPES AT THE SEDIMENTATION BASINS; PROVIDING STORM INLET, CURB INLET, AND OUTFALL PROTECTION; AND ADEQUATELY CONSTRUCTING AND MAINTAINING SILT TRAPS AND SEDIMENTATION BASINS UNTIL THE DRAINAGE AREA IS STABILIZED.