# Gin-Spen, Inc. (TXU010452)
> **Administrative - Formal** · FY2004 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `128134`
- **Case Number:** 06-2004-2350
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Gin-Spen, Inc. (TXU010452)  (SB) (complaint) (settlement)
## Summary

GIN-SPEN, INC. (TXU010452): A storm water compliance inspection was conducted June 2, 2004, by the EPA to determine compliance with the Texas Commission on Environmental Quality (TCEQ) Construction General Permit (CGP).  This  was a linear construction site of approximately seven (7) acres for the installation of a 24  water transmission line. As General Contractor for the City of Heath, Gin-Spen, Inc.,  had submitted timely a Notice of Intent (NOI) but had not received itï¿½s permit number at the time of the inspection.  Observations noted permit violations, including no site inspections had been conducted, controls had not been installed and/or maintained in accordance with the Storm Water Pollution Prevention Plan (SWPPP), and there were no required postings.  An administrative order was drafted to address these violations.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*