# A & T Port Mart
> **Administrative - Formal** · FY2004 · — · Final Order With Penalty
## Case
- **Activity ID:** `129067`
- **Case Number:** 06-2004-4804
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- A & T Port Mart (complaint) (settlement)
## Summary

* Failed to provide a means of secondary containment to cover the entire capacity of the largest single tank for the oil storage tank installation.

* Failed to prepare an SPCC

* Failed to provide appropriate containment and/or diversionary structures for areas where the tank trucks transfer oil/fuel to the tank.

*  Failure to implement an SPCC plan for its facility as required by 40 C.F.R.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*