# PE&H Investments (TXU010444)
> **Administrative - Formal** · FY2004 · — · Final Order With Penalty
## Case
- **Activity ID:** `137324`
- **Case Number:** 06-2004-2147
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- PE&H Investments (TXU010444) (SB) (complaint) (settlement)
## Summary

PE&H INVESTMENTS (TXU010444): A storm water compliance inspection was conducted by EPA at the commercial construction site of the Mazda of Midland on March 16, 2004, to determine the compliance status of PE&H Investments.  It was determined that, as an operator, PE&H Investments was not in compliance with the Storm Water Construction General Permit in that they had not developed a Storm Water Pollution Prevention Plan (SWPPP) not had they applied for permit coverage.  As they met the criteria for an Expedited Settlement Offer (ESO), one was extended and accepted for a penalty amount of $6300.00.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*