12/28/04 - COMPLIANCE ORDER ISSUED.
VIOLATIONS:
FAILURE TO PROPERLY MAINTAIN THE FOLLOWING EROSION AND SEDIMENT CONTROLS: SILT FENCING, SEDIMENT PONDS, STORM DRAIN INLET AND OUTLET PROTECTION THROUGHOUT THE SITE.
FAILURE TO PROPERLY STABILIZE LARGE AREAS OF THE SITE.
FAILURE TO RETAIN RECORDS AT THE SITE.
ORDER REQUIRES:
RESPONDENT SHALL SUBMIT A COMPLETE COPY OF THE SWPPP TO EPA AND SCDHEC WITHIN 14 DAYS.
RESPONDENT SHALL PROVIDE OPERATION AND MAINTENANCE BY REPAIRING SILT FENCING THROUGHOUT THE SITE AND INSTALLING PROTECTION AT SOTRM DRAIN INLETS THROUGHOUT THE SITE TO PREVENT SEDIMENT DISCHARGE OFF-SITE IN THE FUTURE, AND INITIATE STABILIZATION MEASURES ON PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED WITHIN 7 DAYS.
RESPONDENT SHALL CLEAN AND MAINTAIN ALL SEDIMENTATION PONDS WITHIN 7 DAYS BY IMPLEMENTING AT A MINIMUM THE FOLLOWING: REMOVING SEDIMENT FROM PONDS, PROVIDING ROCK PROTECTION AROUND RISERS IN SEDIMENTATION PONDS, PROVIDING INLET PIPE PROTECTION AND OUTFALL PROTECTION AT PONDS. RESPONDENT SHALL MODIFY THE SWPPP WITHIN 7 DAYS.
RESPONDENT MUST IMMEDIATELY INSTITUTE AN INSPECTION PROGRAM, IF ONE DOES NOT ALREADY EXIST, WHICH COMPLIES WITH PART IV.D.4 OF THE PERMIT, FOR ALL DISTURBED AREAS AND AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION, ALL EROSION AND SOIL CONTROL MEASURES IDENTIFIED IN THE SWPPP, ALL DISCHARGE LOCATION, AND ALL VEHICLE ENTRY AND EXIT LOCATIONS WIT