Multimedia inspection uncover unpermitted stormwater discharges. The injunctive relief for this enforcement action required the facility to obtain an NPDES Stormwater permit. This permit will require the facility to monitor stormwater discharges origination from an industrial area. There was no reduction of pollutants as a result of this enforcement action, only statutory regulation of a stormwater outfall.