Summary of Findings:
Inspections and tests required by 40 CFR Part 112 are not in accordance with written procedures developed for the facility.
Spill prevention briefings are not scheduled and conductd periodically.
Accumulated oil on the erainwater is not removed and dreturned to storage or disposed of in accordance with legally approved methods.
Size of secondary containment appears to be inadequate for containers and treating facilities.