# USTPO FY08 Black OIl Co. aka 7-2-11 #25
> **Administrative - Formal** · FY2008 · — · Final Order With Penalty
## Case
- **Activity ID:** `1400006093`
- **Case Number:** 09-2008-5527
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Derrel Pitts (complaint) (settlement)
## Summary

280.31(c) Failure to inspect impressed current systems every 60 days. (Not Prevent)
280.41(b)(1)(ii) Failure to conduct annual line tightness test or perform monthly monitoring on pressurized piping. (Not Detect)
280.45(c) Failure to document every calibration, maintenance, and repair of release detection.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*