# USTPO FY08 Crossroads Trading Post #713
> **Administrative - Formal** · FY2008 · — · Final Order With Penalty
## Case
- **Activity ID:** `1400006135`
- **Case Number:** 09-2008-5528
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Robert Moss, Red Mesa (complaint) (settlement)
## Summary

280.20(a)(2)(ii) Installation of an improperly designed cathodic protection system for a metal tank. (Not Prevent)
280.31(b)(1) Failure to ensure that cathodic protection system is tested every 3 years. (Not Prevent)

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*