The facility was inspected by EPA Contractors on April 10, 2008. The contractor noted that a failure to continuously operate CP and interstitial monitoring. Subsequent information verified the CP was done; that FC violation was withdrawn. EPA reviewed the Inspection Checklist and issued a Field Citation from the desk.