← EPA enforcement cases

WALTHOM GROUP - SOUTHTECH BUSINESS PARK

Administrative - Formal · FY2009 · — · Unilateral Administrative Order Without Adjudication · 1400018636

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2009-4761
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
Self-disclosure
N

Defendants (2)

Summary

11/28/2008 - ADMINISTRATIVE ORDER ISSUED. ORDER STATES: DURING THE CSWEI, EPA INSPECTORS OBSERVED THE FOLLOWING: A. THE PLAN WAS NOT IMPLEMENTED AS APPROVED, AS REQUIRED BY PART I.A.2 OF THE PERMIT. SEDIMENT TRAP 9 ON THE SOUTHERN PORTION OF THE DEVELOPMENT WAS INSTALLED AT A DIFFERENT LOCATION FROM WHAT WAS APPROVED ON THE PLAN. THE SKIMMERS IN SEDIMENT TRAPS 3, 7, AND 8 WERE NOT INSTALLED PROPERLY. THERE WAS A SEDIMENT TRAP ON THE WESTERN PORTION OF THE DEVELOPMENT NOT DENOTED IN THE PLAN. B. INSPECTION REPORTS WERE NOT MADE AVAILABLE UPON REQUEST AT THE TIME OF THE INSPECTION, AS REQUIRED BY PART I.B.3 OF THE PERMIT. C. STORM WATER CONTROLS WERE NOT BEING OPERATED AND MAINTAINED AT OPTIMUM EFFICIENCY, AS REQUIRED BY PART I.C.2, PART II.C.1 OF THE PERMIT. SEVERAL INLET AND OUTLET STRUCTURES ALOGN ROAD '02 WERE FULL OF SEDIMENT AND NEEDED MAINTENANCE. PERIMETER SILT FENCING ON THE CUL-DE-SAC OF ROAD 02 NEEDED MAINTENANCE. SEDIMENT TRAPS 3,7,8, AND 9, AND THE DIVERSION DITCHES ALONG ROAD 02 NEEDED TO BE STABLIZED. THE PIPE OBSERVED DISCHARGING NON-STORM WATER NEEDED TO BE REMOVED OR DIVERTED TO SEDIMENT TRAP 9. THE OUTFALLS TO THE SEDIMENT TRAPS NEEDED APPROPRIATE RIP-RAP OUTLET.

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown