12/11/08 - ADMIN ORDER ISSUED. BASED ON INFO AVAILABLE TO EPA, THE SYSTEM FAILED TO SUBMIT A STANDARD MONITORING PLAN, A SYSTEM SPECIFIC STUDY PLAN, OR A 40/30 CERTIFICATION TO THE EPA BY APRIL 1, 2008. THEREFORE, THE SYSTEM IS IN VIOLATION OF 40 CFR 141.600(c)(1).
ORDER REQUIRES:
WITHIN 30 DAYS, THE SYSTEM SHALL PREPARE A STANDARD MONITORING PLAN IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.601(a); OR A SYSTEM SPECIFIC STUDY PLAN IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.602(a); OR A 40/30 CERTIFICATION IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.603(b).
WITHIN 30 DAYS, THE SYSTEM SHALL SUBMIT THE STANDARD MONITORING PLAN PREPARED PURSUANT TO 40 CFR 141.601(a); OR THE SYSTEM SPECIFIC STUDY PLAN PREPARED TO 40 CFR 141.602(a); OR THE 4030 CERTIFICATION PREPARE PURSUANT TO 40 CFR 141.603(b) TO EPA.