# Central Garage (SB)
> **Administrative - Formal** · FY2009 · — · Final Order With Penalty
## Case
- **Activity ID:** `1400026366`
- **Case Number:** 02-2009-7938
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Central Garage (SB) (complaint) (settlement)
## Summary

The facility was inspected by EPA Contractors on July 8, 2008.  The contractor noted that there was a failure to appropriately equip the pressurized lines with an automatic line leak detector. EPA reviewed the Inspection Checklist and issued a Field Citation from the desk.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*