← EPA enforcement cases

SMYRNA, TN, TOWN OF

Administrative - Formal · FY2009 · — · Final Order With Penalty · 1400028453

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2009-8004
Type
Administrative - Formal
Lead
EPA
Outcome
Final Order With Penalty
Multimedia
Self-disclosure
N

Defendants (1)

Summary

1/27/09 - EXPEDITED SETTLEMENT AGMT ISSUED, ASSESSING A PENALTY OF $1,080. ALLEGED VIOLATIONS: BASED ON A COMPLIANCE MONITORING INSPECTION, EPA ALLEGES THAT RESPONDENT VIOLATED THE CAA'S CEHMICAL ACCIDENT PREVENTION PROGRAM WHEN RESPONDENT DID NOT PROVIDE EVIDENCE THAT: (1) IT HAD PERFORMED A PROCESS HAZARD ANALYSIS USING A TEAM WITH EXPERTISE IN ENGINEERING AND PROCESS OPERATIONS TO IDENTIFY, EVALUATE AND CONTROL PROCESS HAZARDS AS REQUIRED BY 40 CFR 68.67(a); AND (2) IT HAD DEVELOPED WRITTEN OPERATING PROCEDURES WHICH ADDRESS THE FOLLOWING: STEPS FOR EACH OPERATING PHASE (a) EMERGENCY SHUTDOWN INCLUDING THE CONDITIONS UNDER WHICH EMERGENCY SHUTDOWN IS REQUIRED, AND THE ASSIGNMENT OF SHUTDOWN RESPONSIBILITY TO QUALIFIED OPERATORS TO ENSURE THAT EMERGENCY SHUTDOWN IS EXECUTED IN A SAFE AND TIMELY MANNER (40 CFR 68.69(a)(1)(iv)); AND (b) STARTUP FOLLOWING A TURNAROUND, OR AFTER AN EMERGENCY SHUTDOWN (40 CFR 68.69(a)(1)(vii)) AND SAFETY AND HEALTH CONSIDERATIONS : (a) PROPERTIES OF, AND HAZARDS PRESENTED BY PROCESS CHEMICALS (40 CFR 68.69(a)(3)(i)); AND (b) CONTROL MEASURES TO BE TAKEN IF PHYSICAL CONTACT OR AIRBORNE EXPOSURE OCCURS (40 CR 68.69(a)(3)(iii)). (3) IT HAS ANNUALLY CERTIFIED THAT OPERATING PROCEDURES ARE CURRENT AND ACCURATE (40 CFR 68.69(c)).

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown