# Bethany Lutheran Home
> **Administrative - Formal** · FY2005 · — · Final Order With Penalty
## Case
- **Activity ID:** `142027`
- **Case Number:** 08-2005-0053
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Bethany Lutheran Home for the Aged (complaint) (settlement)
- Gil Haugan Construction, Inc. (complaint) (settlement)
## Summary

This administrative penalty order is issued to the Bethany Lutheran Home for the Aged and Gil Haugan Constructin Company for failure to obtain a stormwater permit prior to commencing construction activities, failure to develop a storm water pollution prevention plan, failure to install and/or maintain sediment and erosion controls, failure to implement permanent control measures and stabilization measures; and failure to conduct and/or maintain records of inspections.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*