Summary of Findings:
Inspections and tests required by 40 CFR Part 112 are not in accordance with written procedures developed for the facility.
Container material and construction are not compatible with the oil stored and the conditions of storage.
Size of secondary containment appears to be inadequate for containers and treating facilities.
Excessive vegetation which affects the integrity and/or walls of contianment system are slightly eroded or have low areas.