# Estancias de Sievas de Maria
> **Administrative - Formal** · FY2005 · — · Unilateral Administrative Order Without Adjudication
## Case
- **Activity ID:** `150516`
- **Case Number:** 02-2005-3216
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Unilateral Administrative Order Without Adjudication
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Estancias de Sievas de Maria (settlement)
- T&T Engineering, Royal Construction (settlement)
## Summary

The site is approximately 19.4 acres, it did not file for a construction general permit.  There were no storm water controls in place and they did not have a Storm Water Pollution Prevention Plan.  The facility will be required to develop and implement a SWPPP and fix controls.  Constructin at the site is nearly completed.  The site was referred to the Water Compliance Branch by the Wetlands Section

---