# Aries Operating (Braken Well No. 1)
> **Administrative - Formal** · FY2005 · — · Final Order With Penalty
## Case
- **Activity ID:** `150528`
- **Case Number:** 06-2005-4375
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Aries Operating (complaint) (settlement)
## Summary

Summary of Findings:

Inspections and tests required by 40 CFR Part 112 are not in accordance with written procedures developed for the facility.

No training on the operation and maintenence of equipment to prevent discharges.

Above ground valves and pipelines are not examined periodically on a cheduled basis for general condition (includes items, such as:Flange joings, vlave glands 2nd bodies, drip pans, pipeline supports, bleeder and gauge vales, polish rods/stuffing box.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*