On August 11, 2004, an inspection was conducted to determine whether the facility was complying with RMP regulations. The facility submitted an initial RMP on April 12, 2000. Some more serious violations include: Not addressing engineering and administrative controls applicable to hazards and interrelationships in their PHA; Not addressing consequences of failure of engineering and administrative controls in their PHA; Not evaluating a range of possible safety and health effects arising from failure in controls in their PHA; Not having emergency shutdown procedures; Not documenting and retaining the last two compliance audits and their findings.