6/21/05 - COMPLIANCE ORDER ISSUED.
VIOLATIONS:
1. PART I.A.2 OF THE PERMIT BY FAILING TO FOLLOW THE APPROVED PLAN FOR CONSTRUCTION & MAINTENANCE OF STREAM CROSSINGS.
2. PARTS I.B.1; I.B.2; AND I.B.3 OF THE PERMIT BY FAILING TO PROPERLY INSPECT & KEEP A RECORD OF THE EROSION & SEDIMENT CONTROL FACILITY INSPECTIONS.
3. PARTS I.B.2; II.B.1; AND II.B.2 OF THE PERMIT BY FAILING TO TAKE CORRECTIVE ACTION IMMEDIATELY TO CONTROL THE DISCHARGE OF SEDIMENTS.
4. PARTS I.C.1; I.C.2; II.B.2; AND II.C.1 OF THE PERMIT BY FAILING TO COMPLY W/ ALL REQUIREMENTS OF THE PERMIT & PROVIDE PROPER OPERATION & MAINTENANCE.
ORDER REQUIRES:
A.. IMMEDIATELY INSTALL STREAM CROSSING IN ACCORDANCE W/PLAN. W/IN 30 DAYS, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT HAS BEEN MET.
B. IMMEDIATELY, BEGIN INSPECTING ALL EROSION & SEDIMENTATION CONTROL FACILITIES & STORMWATER RUNOFF DISCHARGES AT LEAST ONCE EVERY 7 CALENDAR DAYS & WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 INCHES OF RAIN PER 24 HOUR. EVERY 30 CALENDAR DAYS, FOR A PERIOD OF 90 DAYS, SUBMIT COPIES OF SUCH INSPECTION REPORTS.
C. IMMEDIATELY, BEING INSPECTING ALL STORMWATER RUNOFF DISCHARGES & TAKE CORRECTIVE ACTION TO CONTROL THE DISCHARGE OF VISIBLE SEDIMENTS LEAVING THE DISTURBED LIMITS OF THE SITE. WITHIN 30 DAYS, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT HAS BEEN MET.
D. IMMEDIATELY, BEGIN KEEPING A RECORD OF INSPECTIONS, INCLUDING VISIBLE SEDIMENTATION FOUND OUTSIDE THE DISTURBED LIMITS OF THE SIT