The facility failed to monitor its pumps and valves; failed to conduct daily inspections of its ancillary equipment which was a part of the tank system; failed to inspect the above portion of the tank system and failed to conduct a written tank assessment prior to March 2004.
Withdrawn by the Region December 8, 2006.