PANACEA COASTAL REALTY, INC. / TAR PINES SUBDIVISION

Administrative - Formal · FY2005 · — · Unilateral Administrative Order Without Adjudication · 154262

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2005-4791
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
Self-disclosure
N

Defendants (1)

Summary

8/12/05 - COMPLIANCE ORDER ISSUE.D VIOLATION: FAILURE TO COMPLY WITH THE REQUIREMENTS OF THE CWA BY DISCHARGING STORMWATER INTO WATERS OF THE U.S. FROM ITS FACILITY WITHOUT BENEFIT OF COVERAGE UNDER THE FDEP PERMIT. ORDER REQUIRES: A. IMMEDIATELY, COMPLETE AND SUBMIT A NOI TO FDEP OR CEASE ALL STORM WATER DISCHARGES FROM THE CONSTRUCTION SITE. WITHIN 30 DAYS, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT HAS BEEN MET. B. IMMEDIATELY, PREPARE AND IMPLEMENT A STORM WATER POLLUTION PREVENTION PLAN (SWPPP). THE SWPPP SHALL ENSURE THAT THE OBSERVATIONS MADE DURING THE CSWEI ARE ADDRESSED. WITHIN 30 DAYS, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT HAS BEEN MET. C. IMMEDIATELY, INSTITUTE A SELF-INSPECTION PROGRAM AS REQUIRED BY PART V.4 OF THE PERMIT. WITHIN 30 DAYS, SUBMIT DOCUMENTATION THAT THIS REQUIREMENT OF THE ORDER HAS BEEN MET. COPIES OF INSPECTION REPORTS SHALL BE SENT TO BOTH EPA AND FDEP FOR A PERIOD OF THREE MONTHS BEGINNING WITH THE EFFECTIVE DATE OF THIS ORDER. THE INSPECTION PROGRAM SHALL ENCOMPASS THE FOLLOWING: (1) AS REQUIRED BY PART V.4 OF THE PERMIT, PROVIDE A QUALIFIED INSPECTOR TO INSPECT AND MAINTAIN RECORDS OF ALL POINTS OF DISCHARGE INTO SURFACE WATERS OR A MUNICIPAL SEPARATE STORM SEWER SYSTEM. INSPECTIONS SHOULD ALSO BE MADE ON DISTURBED AREAS OF THE CONSTRUCTION SITE THAT HAVE NOT BEEN FINALLY STABLIZED, AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION, ALL STRUCTURAL CONTROLS, AND LOCATIONS WHERE VEHICLES ENT

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown