8/25/05 - NOTICE OF DETERMINATION ISSUED. COOPER FAILED TO CORRECTLY REPORT AS-CONSTRUCTED BOILER CAPACITIES IN ITS 1996 TITLE V PERMIT APPLICATION, AS REQUIRED BY 40 CFR 70.5(b). COOPER CORRECTED THIS VIOLATION BY SUBMITTING A PERMIT MODIFICATION TO THE KENTUCKY DEPT FOR ENVIRONMENTAL PROTECTION ON DECEMBER 9, 2003.