# RESERVE AT SPRINGTON LP (GAMBONE)
> **Administrative - Formal** · FY2005 · — · Final Order With Penalty
## Case
- **Activity ID:** `161228`
- **Case Number:** 03-2005-0386
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- RESERVE AT SPRINGTON LP (GAMBONE) (SB) (complaint) (settlement)
## Summary

RESPONDENT VIOLATED ITS GENERAL CONSTRUCTION STORMWATER NPDES PERMIT WHEN IT FAILED TO IMPLEMENT SEVERAL PROVISIONS OF THE EROSION AND SEDIMENTATION CONTROL PLAN WHICH IS REQUIRED BY THE PERMIT.  VIOLATIONS INCLUDED NOT INSTALLING BASINS PRIOR TO CONSTRUCTION, NOT MAINTAINING SILT FENCE, AND EXCEEDING LIMITS OF DISTURBANCE.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*