# FLETCHERS PAINT
> **Administrative - Formal** · FY2001 · — · Final Order No Penalty
## Case
- **Activity ID:** `1632`
- **Case Number:** 01-2001-0187
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order No Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** $14.00M
- **Multimedia (multi-env):** N
## Defendants
- FLETCHERS PAINT (settlement)
## Summary

07/16/2001: ISSUANCE OF UNILATERAL ADMINISTRATIVE ORDER UNDER SECTION 106A TO GENERAL ELECTRIC FOR REMEDIAL DESIGN AND REMEDIAL ACTION AT THE FLETCHERS PAINT WORKS SITE. THE ORDER REQUIRES GE TO PERFORM THE REMEDY SELECTED IN THE ROD WHICH CONSISTS OF EXCAVATION OF PCB CONTAMINATED SOILS AND TREATMENT BY THERMAL DESORPTION.
06/11/2010:  AMENDED ADMINISTRATIVE ORDER.
01/05/2011:  APPEAL WAS FILED.
02/29/2012:  FIRST CIRCUIT COURT UPHELD THE RULING.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*