10/20/05 - EXPEDITED SETTLEMENT AGREEMENT ISSUED, ASSESSING A PENALTY OF $780. RESPONDENT FAILED TO DOCUMENT AND COMPILE AS PART OF THE PROCESS SAFETY INFORMATION: INFORMATION PERTAINING TO THE EQUIPMENT IN THE PROCESS: (A) ELECTRICAL CLASSIFICATION (40 C.F.R SECTION 68.65(d)(1)(iii); (B) RELIEF SYSTEM DESIGN AND DESIGN BASIS (40 C.F.R. SECTION 68.65(d)(1)(iv); (C) 68.65(d)(1)(v); AND (D) DESIGN CODES AND STANDARDS EMPLOYED (40 C.F.R. SECTION 68.65(d)(1)(vi). RESPONDENT FAILED TO PROPERLY CERTIFY ANNUALLY THAT OPERATING PROCEDURES ARE CURRENT AND ACCURATE (40 C.F.R SECTION 68.69(c). AT THE TIME OF THE INSPECTION, THE WRITTEN VALVE IDENTIFICATION IN THE OPERATING PROCEDURES DID NOT EXACTLY CORRESPOND TO THE ACTUAL IDENTIFICATION LABELS PHYSICALLY ATTACHED TO THE PROCESS VALVES. RESPONDENT FAILED TO ESTABLISH AND DOCUMENT THE NECESSARY TIME PERIOD FOR THE MANAGEMENT OF CHANGE THAT WAS ISSUED ON JANUARY 23, 2004 (40 C.F.R SECTION 68.75(b)(4).