# CITY OF BLACKFOOT, IDAHO - SNAKE RIVER DIVERSION STRUCTURES
> **Administrative - Formal** · FY2006 · — · Final Order With Penalty
## Case
- **Activity ID:** `169331`
- **Case Number:** 10-2006-0099
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- City of Blackfoot, Idaho (SB) (complaint) (settlement)
## Summary

In 2002 and 2005, and at times more fully known to the City of Blackfoot (Respondent), the city and/or persons acting on its behalf, discharged dredged or fill material below the ordinary high water mark without a 404 permit while reconstructing or maintaining diversion structures in the Snake River near the I-15 bridge near the City of Blackfoot, Idaho.  During this time period, the city placed dredged and/or fill material into approximately 0.5 acres of riverbed and adjacent riparian areas.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*