# TUCKAHOE TURF FARMS INC
> **Judicial** · FY2002 · — · Final Order With Penalty
## Case
- **Activity ID:** `1736`
- **Case Number:** 01-2002-0099
- **Type:** Judicial
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** N
## Defendants
- TUCKAHOE LAND INVESTMENT CO INC (complaint) (settlement)
- TUCKAHOE TURF FARMS INC (complaint) (settlement)
## Summary

TUCKAHOE TURF FARM INC IS A PRODUCER OF SOD FOR COMMERCIAL AND RESIDENTIAL USE. TUCKAHOE LAND INVESTMENT CO INC (tTLI) IS A RELATED ENTITY, ORGANIZED FOR THE PURPOSE OF PURCHASING AND HOLDING PROPERTY. TUCKAHOE TURF ACQUIRED LAND IN BERWICK, ME STARTING IN 1985, TRANSFERING TITLE TO ITS PROPERTIES TO TLI IN 1990. TUCKAHOE TURF HAS USED PORTIONS OF THE PROPERTIES FOR PRODUCTION OF SOD AND OTHER CROPS SINCE 1986.      
   VIOLATIONS OF THE CWA HAVE OCCURRED AT TWO SEPARATE SITES IN BERWICK. THE FIRST, KNOWN AS  SITE 1  LOCATED ADJACENT TO THE SALMON FALLS RIVER, IS NOT YET IN SOD PRODUCTION. IN 1998 AND 1999, TUCKAHOE TURF STUMPED AND CLEARED THE SITE, PILING THE STUMPS AND STICKS IN WINDROWS; INSTALLED A DRAINAGE SYSTEM OF PIPES EMBEDDED IN SAND TO DRAIN THE WETLANDS; AND HARROWED THE SITE. TTF STOPPED WORK AT SITE 1 IN 1999 AFTER EPA BEGAN ITS INVESTIGATION. BASED ON OUR SITE INSPECTIONS (INCLUDING DIGGING OF TEST PITS AND A VEGETATIVE ASSESSMENT), AND A REVIEW OF NATIONAL WETLANDS INVENTORY MAPS, SOIL SURVEY DATA, AND AERIAL PHOTOGRAPHY, WE CONCLUDED THAT APPROXIMATELY 39.5 ACRES OF WETLANDS HAD BEEN IMPACTED AT SITE 1.
   EPA HAS ALSO INVESTIGATED POTENTIAL WETLANDS VIOLATIONS AT ANOTHER NEARBY SITE OWNED BY TLI, KNOWN AS  SITE 3 . SITE 3 IS A LARGE PARCEL, BOUNDED BY KEAY BROOK TO THE NORTH, LAKE HATFIELD TO THE EAST, AND THE LITTLE RIVER, A TRIBUTARY TO THE SALMON FALLS RIVER, TO THE SOUTH. AS EARLY AS 1986, TUCKAHOE TURF CLEARED AND STUMPED PORTIONS OF THIS SITE.  AS W

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*