# Cantrell Energy Corporation
> **Administrative - Formal** · FY2006 · — · Final Order With Penalty
## Case
- **Activity ID:** `174980`
- **Case Number:** 06-2006-1940
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- Cantrell Energy Corporation (complaint) (settlement)
## Summary

VIOLATIONS:  The Respondent's oil field facility was a  point source   discharge  of  pollutants,  specifically oil field brine (produced water), to the receiving waters of Spring Creek, located in Carter County, Oklahoma.  The EPA observed the facility had discharged brine during a September 16, 2005 inspection.  

RELIEF:  The Class I Complaint proposes up to a $32,500 penalty for the violations.  An  environmental restoration and protection  SEP has been negotiated with Cantrell Energy Corporation and the Consent Agreement and Final Order contains the details of the project.  Along with the SEP a penalty of $1,200 is required for settlement. An EPA inspection conducted on March 1, 2006 indicated the SEP was completed.

---
*Source: [EPA ECHO](https://echo.epa.gov/) · AI Analytics · CC0 1.0*