← EPA enforcement cases

KING, STEVEN (OPELIKA KING PROPERTY)

Administrative - Formal · FY2009 · — · Unilateral Administrative Order Without Adjudication · 1800001165

Penalty
Cost recovery
Compliance action

Case

Case Number
04-2009-4795
Type
Administrative - Formal
Lead
EPA
Outcome
Unilateral Administrative Order Without Adjudication
Multimedia
Self-disclosure
N

Defendants (1)

Summary

6/23/09 - ADMINISTRATIVE ORDER ISSUED. ON FEB 25, 2009, EPA AND ADEM PERFORMED A COMPLIANCE STORM WATER EVALUATION INSPECTION (CSWEI) AT THE DEVELOPMENT. DURING THE CSWEI, EPA OBSERVED THE FOLLOWING: A. NO BMPs WERE IMPLEMENTED ALTHOUGH LAND HAD BEEN CLEARED AND GRADING WAS TAKING PLACE. B. A SIGN WAS POSTED AT THE FRONT ENTRANCE TO THE DEVELOPMENT, BUT WAS NOT CURRENT AS IT DISPLAYED APPLIED FOR INSTEAD OF THE ADEM NPDES REGISTRATION. C. THE SELF-INSPECTION REPORT DATED JAN 7, 2009, CITED A DISCHARGE OF SEDIMENT INTO THE RECEIVING WATERS, AN UNNAMED TRIBUTARY TO SAUGAHATCHEE CREEK, AND STATED THAT PERIMETER SILT FENCING AND A TEMPORARY SEDIMENT BASIN WILL BE INSTALLED. HOWEVER, THESE BMPs WERE NOT YET INSTALLED AT THE TIME OF THE INSPECTION. D. THE SELF-REPORTING WAS INSUFFICIENT: NO STRUCTURAL BMPs WERE IMPLEMENTED AT THE TIME OF EPA'S INSPECTION. THERE WAS NO EVIDENCE THAT BMPs WERE IN PLACE PRIOR TO EPA'S INSPECTION; HOWEVER THE LACK OF INSTALLATION OF BMPs WAS NOT NOTED NOR REPORTED IN THE MONTHLY REPORTS AS REQUIRED. IN ADDITION, PART 335-6-12-.28(4)(f) OF THE PERMIT REGULATIONS REQUIRES COMPLETE INSPECTIONS AS OFTEN AS NECESSARY UNTIL ANY NON-COMPLIANT BMPs OBSERVED DURING A PRIOR INSPECTION ARE CORRECTED AND DOCUMENTED AS BEING IN COMPLIANCE. ONLY ONE INSPECTION PER MONTH WAS CONDUCTED, EVEN AFTER THE SELF-INSPECTION NOTED DEFICIENCIES IN THE JAN 5 AND 7, 2009 REPORTS. FURTHER THE SELF-INSPECTIONS DID NOT NOTE INADEQUATE OR MISSING BMPs WITHIN

Source

Authoritative
EPA ECHO
Machine
JSON-LD · Markdown