7/17/09 - ADMINISTRATIVE ORDER ISSUED. BASED ON INFORMATION AVAILABLE TO EPA, THE SYSTEM FAILED TO SUBMIT A STANDARDS MONITORING PLAN, A SYSTEM SPECIFIC STUDY PLAN, OR A 40/30 CERTIFICATION TO THE EPA BY APRIL 1, 2008. THEREFORE, THE SYSTEM IS IN VIOLATION OF 40 CFR 141.600(c)(1).
ORDER REQUIRES:
WITHIN 30 DAYS, THE SYSTEM SHALL PREPARE AND SUBMIT A STANDARD MONITORING PLAN IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.60(a); OR A SYSTEM SPECIFIC STUDY PLAN IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.602(a); OR A 40/30 CERTIFICATION IN ACCORDANCE WITH THE PROVISIONS OF 40 CFR 141.603(b).