# CHAPARRAL ENERGY, LLC
> **Administrative - Formal** · FY2009 · — · Final Order With Penalty
## Case
- **Activity ID:** `1800008796`
- **Case Number:** 06-2009-1114
- **Type:** Administrative - Formal
- **Lead:** EPA
- **Outcome:** Final Order With Penalty
- **Penalty assessed:** —
- **Cost recovery:** —
- **Compliance action $:** —
- **Multimedia (multi-env):** —
## Defendants
- CHAPARRAL ENERGY, LLC (complaint) (settlement)
## Summary

VIOLATIONS:	OSAGE UNDERGROUND INJECTION CONTROL (UIC) REGULATIONS REQUIRE OPERATORS OF INJECTION WELLS TO OBTAIN A UIC PERMIT FROM THE ENVIRONMENTAL PROTECTION AGENCY BEFORE CONVERTING A WELL TO INJECTION OR USING THE WELL FOR FLUID INJECTION.  RESPONDENT OPERATED AN INJECTION WELL WITHOUT A PERMIT FROM THE EPA.

REMEDY:	RESPONDENT SUBSEQUENTLY RECEIVED A UIC PERMIT AND AUTHORIZATION TO INJECT FROM THE EPA.  THEREFORE, THE ENFORCEMENT ACTION IS TO ASSESS A PENALTY ONLY.

---