The facility was inspected by an EPA contractor on March 25 2008. The Inspection Checklist was reviewed by EPA. The contractor noted that there was a failure to maintain paperwork documenting compliance with release detection and a failure to monitor the pressurized lines monthly. EPA concurred and issued a Field Citation from the desk.